The cabinets are in, the tile is down, the paint is being sprayed up this week. So far things are coming right along.
That does not mean, however, that the rest of this is without stress.
I somehow need to get the front porch pained before next Monday before they put the screen up.
I'm still incredibly worried that the contractor is going to ask for more money at the end of all of this in spite of originally saying all the work would be done for what the insurance company would give us.
We have to spend an extra $1100 to get our well going again because sitting for 4 months has killed the motor.
The library is up but I still need to paint the exterior and we need to finish off the interior. I got the estimate from the contractor and I'm really torn. The quote on the electrical work is way more than he originally said it would be and it doesn't cover enough electricity for what we need. The insulation and drywall is really expensive and way more than I anticipated it should cost. We were already planning to put the laminate floor ourselves. I just spent $850 on a heater/ac unit for the building. At this point I don't know if we can afford to get everything done or if all the work can be done before we want to use the building for storage so we can move back into our house. We're still thinking through all the options.